
{"id":731,"date":"2007-11-09T08:53:45","date_gmt":"2007-11-09T15:53:45","guid":{"rendered":"http:\/\/montaraventures.com\/blog\/2007\/11\/09\/needed-smart-grid\/"},"modified":"2007-11-09T08:53:45","modified_gmt":"2007-11-09T15:53:45","slug":"needed-smart-grid","status":"publish","type":"post","link":"https:\/\/montaraventures.com\/blog\/2007\/11\/09\/needed-smart-grid\/","title":{"rendered":"Needed: Smart Grid"},"content":{"rendered":"<p><center>NERC Grid Control Point Map<br \/><img decoding=\"async\" src=\"https:\/\/montaraventures.com\/pix\/nerc_map.gif\" alt=\"NERC Grid Control Point Map\" \/><\/center><br \/>\nSorry to do this two days in a row, but <a href=\"https:\/\/www.renewableenergyaccess.com\/rea\/news\/story?id=50519\" target=\"_blank\" >Renewable Energy Access<\/a> is on a roll. Today&#8217;s great content revolves around rebuilding the electrical grid.<\/p>\n<blockquote><p>\nCreating a 21st Century Grid<br \/>\nby Stephen Lacey, Staff Writer<\/p>\n<p>In 1957, as Eisenhower began his second term as U.S. President, the first satellite launched into orbit and the first commercial nuclear reactor came online, electrical workers all over the country were installing the world&#8217;s most advanced transmission and distribution (T&#038;D) system. Today, much of that T&#038;D system installed 50 years ago remains in place, holding together a patchwork grid for ever-expanding electricity markets.<\/p>\n<p>&#8220;You have to think much more distributed than centralized, you have to solve the problem of storing energy, and it has to be much more like an internet system than the current grid is today in order to be effective.&#8221;<\/p>\n<p>Dr. Wade Adams, Director, Richard E. Smalley Institute for Nanoscale Science and Technology<\/p>\n<p>Now in 2007 \u00e2\u20ac\u201c the age of the internet, personal digital media and distributed energy \u00e2\u20ac\u201d the grid has failed to keep pace with the rapidly changing technological landscape. While most industries rely on technologies that have been invented or updated in the last few years, the electricity delivery industry uses technologies that have more or less stayed the same for 100 years.<\/p>\n<p>There&#8217;s a common idiom that goes, \u00e2\u20ac\u0153if it ain&#8217;t broke don&#8217;t fix it.\u00e2\u20ac\u009d While the grid in the U.S. is hardly broken, it is beginning to deteriorate rapidly in some places, and it will need some serious repairs in order to meet the growing demand for electricity in general and distributed renewable electricity specifically.<\/p>\n<p>\u00e2\u20ac\u0153We need to see a very substantial transformation of the system,\u00e2\u20ac\u009d says David Meyer, Senior Policy Advisor in the Office of Electricity Delivery and Energy Reliability at the U.S. Department of Energy (DOE). \u00e2\u20ac\u0153We&#8217;re outgrowing it in many parts of the nation. It&#8217;s certainly not the high-capacity, integrated and smart system that we need.\u00e2\u20ac\u009d<\/p>\n<p>The current grid is a stiff arrangement of one-way transmission lines, centralized generation facilities and aging substations. The recent emergence of large amounts of renewable electricity in markets around the country are creating new challenges for both the transmission and distribution sectors.<\/p>\n<p><a href=\"https:\/\/www.renewableenergyaccess.com\/rea\/news\/story?id=50519\" target=\"_blank\" >Read more&#8230;<\/a>\n<\/p><\/blockquote>\n","protected":false},"excerpt":{"rendered":"<p>NERC Grid Control Point Map Sorry to do this two days in a row, but Renewable Energy Access is on a roll. Today&#8217;s great content revolves around rebuilding the electrical grid. Creating a 21st Century Grid by Stephen Lacey, Staff Writer In 1957, as Eisenhower began his second term as U.S. President, the first satellite [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[18,3],"tags":[],"_links":{"self":[{"href":"https:\/\/montaraventures.com\/blog\/wp-json\/wp\/v2\/posts\/731"}],"collection":[{"href":"https:\/\/montaraventures.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/montaraventures.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/montaraventures.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/montaraventures.com\/blog\/wp-json\/wp\/v2\/comments?post=731"}],"version-history":[{"count":0,"href":"https:\/\/montaraventures.com\/blog\/wp-json\/wp\/v2\/posts\/731\/revisions"}],"wp:attachment":[{"href":"https:\/\/montaraventures.com\/blog\/wp-json\/wp\/v2\/media?parent=731"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/montaraventures.com\/blog\/wp-json\/wp\/v2\/categories?post=731"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/montaraventures.com\/blog\/wp-json\/wp\/v2\/tags?post=731"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}